How do I start ordering obsolete and discontinued industrial parts from a Chinese factory?

Confidence 4/5 Established practice

A workable first order follows the same sequence in every category: fix the specification in writing including tolerance and finish; decide the quantity against the minimum above; get a physical sample approved before any mass production; agree tooling ownership and payment terms in writing; arrange inspection before the balance is paid; and confirm the HS code and the destination labelling requirements before the goods ship rather than after. For obsolete and discontinued industrial parts the two details that most often delay a first order are supplying a part number without the machine make and model; the same number exists across manufacturers and accepting an "equivalent" for a safety-critical application without documented equivalence.

Sources

What goes wrong with obsolete and discontinued industrial parts

  • Supplying a part number without the machine make and model; the same number exists across manufacturers.
  • Accepting an "equivalent" for a safety-critical application without documented equivalence.
  • Not asking whether the source is the original manufacturer, a licensed maker or an aftermarket copy — all three exist and differ in price and risk.
  • Ordering one unit of a part whose failure mode is fatigue, then having it fail again.
  • Reverse-engineering without verifying the material, only the geometry.

Want this priced for your specification?

Send the requirement and any drawings. You get a supplier shortlist and one landed price, with the cost breakdown shown.

Start a request →