How long does custom apparel and cut-and-sew take to manufacture and ship?

Confidence 4/5 Established practice

Lead time for custom apparel and cut-and-sew:

Sampling and fit approval: 10–20 days. Production: 20–40 days. Add transit.

Sources

What goes wrong with custom apparel and cut-and-sew

  • Quoting before the fabric is chosen. Fabric is typically the majority of the cost.
  • Skipping a fit sample and going straight to production.
  • Not specifying shrinkage or colourfastness standards, then discovering both after the first wash.
  • Assuming the fabric weight matches the sample; GSM varies between mills at the same nominal weight.
  • Ignoring the destination labelling rules until after the goods are printed.

Want this priced for your specification?

Send the requirement and any drawings. You get a supplier shortlist and one landed price, with the cost breakdown shown.

Start a request →