How do I start ordering inspection, verification and quality control from a Chinese factory?

Confidence 4/5 Established practice

A workable first order follows the same sequence in every category: fix the specification in writing including tolerance and finish; decide the quantity against the minimum above; get a physical sample approved before any mass production; agree tooling ownership and payment terms in writing; arrange inspection before the balance is paid; and confirm the HS code and the destination labelling requirements before the goods ship rather than after. For inspection, verification and quality control the two details that most often delay a first order are inspecting only at the end, when design and material choices are already locked in and accepting a factory's own report as independent verification.

Sources

What goes wrong with inspection, verification and quality control

  • Inspecting only at the end, when design and material choices are already locked in.
  • Accepting a factory's own report as independent verification.
  • Skipping inspection because the order is small; small orders are where a total loss is most painful relative to turnover.
  • Not defining what a defect is before the inspection, which makes the report unactionable.
  • Booking an inspection after the goods are already packed and the container is loaded.