How long does inspection, verification and quality control take to manufacture and ship?

Confidence 4/5 Established practice

Lead time for inspection, verification and quality control:

Book 3–5 days ahead. Report within 24–48 hours of the visit. Peak season and Chinese New Year reduce availability sharply, which is worth planning around.

Sources

What goes wrong with inspection, verification and quality control

  • Inspecting only at the end, when design and material choices are already locked in.
  • Accepting a factory's own report as independent verification.
  • Skipping inspection because the order is small; small orders are where a total loss is most painful relative to turnover.
  • Not defining what a defect is before the inspection, which makes the report unactionable.
  • Booking an inspection after the goods are already packed and the container is loaded.