What does tooling cost for inspection, verification and quality control?

Confidence 4/5 Established practice

Tooling for inspection, verification and quality control:

Not applicable. Where fixtures or gauges are needed for verification, they are specified and charged separately.

Sources

What goes wrong with inspection, verification and quality control

  • Inspecting only at the end, when design and material choices are already locked in.
  • Accepting a factory's own report as independent verification.
  • Skipping inspection because the order is small; small orders are where a total loss is most painful relative to turnover.
  • Not defining what a defect is before the inspection, which makes the report unactionable.
  • Booking an inspection after the goods are already packed and the container is loaded.

Want this priced for your specification?

Send the requirement and any drawings. You get a supplier shortlist and one landed price, with the cost breakdown shown.

Start a request →